6 20 18~2480 |
HARVILL KENNETH S & AMY C |
15 |
LAKERIDGE DR |
Draft
|
Fuel Gas |
|
55.00 |
New |
SET 1-120AG LP TANK. RUN APPROX 15' GAS MAIN FROM TANK TO CHIMNEY IN BASEMENT, RUN LINE UP INTO FIREPLACE |
3 6 4-14~1837 |
PUESCHEL RONALD C & CAROL A TRUSTEES |
5 |
HIGHPOINT COMMONS |
Draft
|
Building |
|
588.00 |
Under Review |
Full Roof Replacement - House. Remove existing roof shingles and replace with 44 SQ new architectural asphalt shingles following code and manufacturers recommendations. Install ice & water shield as required by code and apply 4” polymer membrane tape on deck seams as necessary. |
5 17A 8~801 |
TKS HOLDINGS LLC |
9 |
AUSTIN DR |
Draft
|
Building |
|
10208.00 |
New |
Renovation of existing interior commercial space per plans. Plans outline the construction of a music studio/office space with practice and recording rooms, as well as a foyer/lounge area. MEP trades to file permits individually. |
6 26 56-28~1310 |
GREENWALD ROBIN |
17 |
SHERWOOD LN |
Draft
|
Building |
|
432.00 |
Under Review |
Removing and replacing 23 windows, replacing like with like, no structural changes. |
3 11 35FH-2~1807 |
MARQUES MANUEL M + MARIA ROSA |
36 |
HERITAGE DR |
Draft
|
Electrical |
|
276.00 |
Under Review |
Install roof mounted solar PV system, 15 panels (6.150 kW DC). |
3 11 35FH-2~1807 |
MARQUES MANUEL M + MARIA ROSA |
36 |
HERITAGE DR |
Draft
|
Building |
|
133.00 |
Under Review |
Install roof mounted solar PV system, 15 panels (6.150 kW DC). |
10 31 22T~300 |
ROBERG KEVIN & DEBORAH ANN |
121 |
JERRY DANIELS RD |
Draft
|
Electrical |
|
484.00 |
Under Review |
Install roof mounted solar PV system, 25 panels (10.250 kW DC). |
10 31 22T~300 |
ROBERG KEVIN & DEBORAH ANN |
121 |
JERRY DANIELS RD |
Draft
|
Building |
|
237.00 |
Under Review |
Install roof mounted solar PV system, 25 panels (10.250 kW DC). |
10 31 11B-3~100349 |
LASSEN SEAN& NANCY |
167 |
PAPERMILL RD |
Draft
|
Electrical |
|
393.00 |
Under Review |
Install roof mounted solar PV system, 21 panels (8.610 kW DC). |
10 31 11B-3~100349 |
LASSEN SEAN& NANCY |
167 |
PAPERMILL RD |
Draft
|
Building |
|
198.00 |
Under Review |
Install roof mounted solar PV system, 21 panels (8.610 kW DC). |
3 11 23FH~2195 |
RYBAKOV BORIS & XU YUN YUE |
32 |
LAUREL LN |
24-228B
|
Building |
12/05/2024 |
133.00 |
Approved |
INSTALLING A WOOD FIREPLACE INSERT |
5 14 19-2~1459 |
MIGLIARO EDWARD F JR & KAREN E |
10 |
THOMASSIAN DR |
Draft
|
Building |
|
914.00 |
Under Review |
Remove the existing deck build an 18' x 18' addition on the back of the house, with full basement |
5 24 17~2039 |
LARDI WILLIAM |
153 |
SANER RD |
Draft
|
Plumbing |
|
68.00 |
Under Review |
INSTALL 40' 3/4" BLACK PIPE FOR GAS RANGE (PROPANE) |
3 6 4-12~100306 |
PANDUGAYALA RATHNAKAR |
23 |
HIGHPOINT COMMONS |
24-85M
|
Mechanical |
12/04/2024 |
562.00 |
Approved |
Remove existing LP boiler and condensers/hydro air handlers. Install LAARS 199,000 BUT Boiler Model: LFTHF199NA3XN, Carrier Comfort 3 ton A/C Unit Model:24SCA436N003, First company 3 ton fan coil model:36HBXB-HW-TXV410 in basement. Install Carrier Comfort 4 ton A/C Unit model: 24SCA448N003 and First Company 4 ton fan coil model: 48HBXB-HW-TXV410 in attic with antifreeze. Replace thermostats with Carrier ecobee model:EB-STATE3LTCB-01. |
3 6 4-12~100306 |
PANDUGAYALA RATHNAKAR |
23 |
HIGHPOINT COMMONS |
24-147E
|
Electrical |
12/04/2024 |
55.00 |
Approved |
Remove existing LP boiler and condensers/hydro air handlers. Install LAARS 199,000 BUT Boiler Model: LFTHF199NA3XN, Carrier Comfort 3 ton A/C Unit Model:24SCA436N003, First company 3 ton fan coil model:36HBXB-HW-TXV410 in basement. Install Carrier Comfort 4 ton A/C Unit model: 24SCA448N003 and First Company 4 ton fan coil model: 48HBXB-HW-TXV410 in attic with antifreeze. Replace thermostats with Carrier ecobee model:EB-STATE3LTCB-01. |
6 26 13~602 |
HOLT NICHOLAS |
29 |
LAFAYETTE RD |
Draft
|
Electrical |
|
276.00 |
Under Review |
Wire new home, install new lighting, switches and outlets to NEC electric code. Wire new appliances and HVAC equipment. Install new 200 amp electric panel in basement and run sub feed to panel in 2nd floor laundry room. Install interconnected smoke detectors to code |
9 27 5-5~1538 |
AKBARZAI AMJEED |
63 |
EMILY RD |
24-227B
|
Building |
12/04/2024 |
770.00 |
Approved |
Remove and replace approx 57SQ shingled roof with new shingles, drip edge, underlayments, flashings. |
6 26 70~380 |
4-8 EAST HAMPTON RD LLC |
4-8 |
E HAMPTON RD |
Draft
|
Electrical |
|
107.00 |
Under Review |
Replace existing EV Car Charger with new |
6 29 44~655 |
PINTO DOMENICK JOHN |
15 |
GLENWOOD DR |
Draft
|
Building |
|
121.00 |
Payment Due |
13x24 garage shed. in same location as previous garage foundation is a crushed gravel pad. wood construction |
1 2A 6S~2138 |
COCHEFSKI DAVID + MARY |
27 |
RIVERVIEW CIR |
24-220B
|
Building |
12/02/2024 |
328.00 |
Approved |
roof replacement 29sq., re-shingle GAF timberline HDZ, ice and water shield 6', tape plywood seams if applicable |
9 27 6RL~1192 |
ONEIL MICHAEL J + KATHLEEN D |
221 |
FLOOD RD |
24-226B
|
Building |
12/04/2024 |
159.00 |
Approved |
Installation of a propane fired fireplace insert |
6 20 38-1~100432 |
SCHUSTER CATHERINE A & |
9 |
LAKERIDGE DR |
24-144E
|
Electrical |
12/02/2024 |
185.00 |
Approved |
Installation of (24) roof mounted solar panels, 10.20 kW (DC). Add on to existing PV system to total 26.37 kW (DC). No structural changes. |
|