14 0 56 10 |
FOREMAN MARY |
10 |
BITTERSWEET RDG |
Draft
|
Building |
|
134.00 |
New |
Roof replacement 19sq, strip and re-shingle GAF timberline HDZ, Ice and water shield 6", tape plywood seams if applicable. |
10 10.4 1 |
Wolak Carrie Ann |
6 |
PAWNEE |
Draft
|
Electrical |
|
35.00 |
New |
wire and hook up heat pump condenser unit |
13 0 15 |
POWDER RIDGE MOUNTAIN PARK & RESORT LLC |
99 |
POWDER HILL |
Draft
|
Tent |
|
20.00 |
New |
Placement of 2 Tent(s) for Oktoberfest |
13 0 15 |
POWDER RIDGE MOUNTAIN PARK & RESORT LLC |
99 |
POWDER HILL |
Draft
|
Tent |
|
20.00 |
New |
Placement of 1 Tent(s) for Haunted trails |
13 0 15 |
POWDER RIDGE MOUNTAIN PARK & RESORT LLC |
99 |
POWDER HILL |
Draft
|
Zoning Compliance |
|
70.00 |
Under Review |
Expansion of snow making in tubing area |
13 0 15 |
POWDER RIDGE MOUNTAIN PARK & RESORT LLC |
99 |
POWDER HILL |
Draft
|
Tent |
|
20.00 |
Payment Due |
Placement of 1 Tent(s) for Haunted trails |
6 0 125 |
MIERZEJEWSKI LISA A |
146 |
PETERS LA |
Draft
|
Building |
|
277.00 |
Under Review |
FULL ROOF REPLACEMENT - 25 SQ, DEMO EXISTING TO PLYWOOD, INSTALL NEW SEAM TAPE, NEW ICE WATER, NEW SYNTHETIC, NEW ASPHALT SHINGLES |
11 0 84 |
BROWN WILLARD P JR & MARIE C |
25 |
BURT |
Draft
|
Electrical |
|
10.00 |
Under Review |
Install 10kw roof mounted pv solar panels. 34 modules |
11 0 84 |
BROWN WILLARD P JR & MARIE C |
25 |
BURT |
Draft
|
Building |
|
519.00 |
Under Review |
Install 10kw roof mounted pv solar panels, 34 modules |
12 0 29 |
PERRUCCIO STEVEN J TRUSTEE OF |
11 |
CIDER MILL |
Draft
|
Building |
|
46.00 |
Under Review |
Reline the boiler chimney flue with 5>5-inch diameter 316Ti-alloy stainless steel chimney liner |
10 10.4 1 |
Wolak Carrie Ann |
6 |
PAWNEE |
Draft
|
Mechanical |
|
222.00 |
Under Review |
Supply and Install a 4 zone Bosch mini split system Model BMS500-AAM036-1CSXHC outdoor unit, 2- BMS500-AAU009-1AHWXC, 1 BM5500-AAU0012-1AHWXC & 1 BMS500-AAU0018-1AHWXC Indoor units |
9 0 151 |
YANTOSH THOMAS |
108 |
MAIN ST & RT 157 |
23-76CA
|
COC |
09/19/2023 |
|
Closed |
buiold wall, add exhaust fan |
12 0 162 |
SALAFIA ROBERT M & JULIA J |
36 |
EDGEWOOD CT |
23-75CA
|
COC |
09/19/2023 |
|
Approved |
Installation of 20 roof mounted solar panels, no structural upgrades required. |
14 0 56 7 |
SULLIVAN MURIEL F |
7 |
BITTERSWEET RDG |
23-74CA
|
COC |
09/19/2023 |
|
Closed |
InstaPlumbing has been hired by General Contractor Yankee Home Improvement to rough in a customer supplied single handle shower valve, shower strainer and drain.
General Contractor Yankee Home Improvement is conducting demo and trim for project. |
13 0 39 |
HEATH ROBIN L & TERRY A |
92 |
LONG HILL |
23-127B
|
Building |
09/18/2023 |
79.00 |
Approved |
Replace 1 window; no structural changes |
10 10.1 14 |
CORNELLO CAROLYN MARIE & FRANCIS ANTHONY |
71 |
LAKE SHORE |
23-30M
|
Mechanical |
09/18/2023 |
266.00 |
Approved |
Replacement of existing geothermal packaged unit with an Enertech [Hydron] water to air model HYT048 Packaged Unit complete. Reconnecting to existing ground loops and duct system. Includes all components for an operational installation. System does not make domestic hot water.
|
14 0 15-4 |
WEISSBERG HOWARD & CHACE POLLY |
35 |
LONG HILL |
23-126B
|
Building |
09/18/2023 |
189.00 |
Approved |
Remove/replace roofing Install Owens Corning Roofing system Ice and water over entire area home have soffit and ridge venting |
3 0 18 |
LEWIS LORI J |
4 |
LORRAINE TER |
23-125B
|
Building |
09/18/2023 |
156.00 |
Approved |
Strip all layers of existing roofing, replace any damaged roof decking, install 6' ice and water barrier to all eaves, tape plywood decking seams, synthetic paper to remaining exposed decking & install approximately 20 squares of new shingles. |
11 0 178-7 |
TOMPKINS SCOTT & VICTORIA |
46 |
HIGH MEADOW LA |
23-124B
|
Building |
09/18/2023 |
915.00 |
Approved |
Install 52 solar panels on 5 roof arrays, 24.8 KW |
11 0 178-7 |
TOMPKINS SCOTT & VICTORIA |
46 |
HIGH MEADOW LA |
23-85E
|
Electrical |
09/18/2023 |
79.00 |
Approved |
Install 52 solar panels on 5 roof arrays, 24.8 KW |
7 0 17-4 |
DAISOMONT ROBERT & JENIFER |
380 |
BAILEYVILLE RD & RT 147 |
Draft
|
Zoning Compliance |
|
70.00 |
Processing |
install detached garage |
7 0 17-4 |
DAISOMONT ROBERT & JENIFER |
380 |
BAILEYVILLE RD & RT 147 |
Draft
|
Building |
|
684.00 |
Processing |
Garage |
|