| 40 17 18 |
HAMILTON RUSSELL E |
47 |
NORTH MAIN ST |
Draft
|
Electrical |
|
48.00 |
New |
rough wire studio apartment |
| 40 17 18 |
HAMILTON RUSSELL E |
47 |
NORTH MAIN ST |
Draft
|
Electrical |
|
48.00 |
New |
rough wire studio apartment |
| 70 03 04 |
MACDONALD HAYLEY D & |
236 |
CARTER RD |
25-102CA
|
COC |
11/13/2025 |
|
Approved |
Install 6" stainless pipe through chimney and connect to wood stove |
| 62 01 05 |
45TH STREET REALTY LLC |
98 |
REYNOLDS BRIDGE RD |
Draft
|
Building |
|
130.00 |
New |
Strip and re-roof with asphalt shingles. Ice and water and seam tape to code. Replace damaged plywood only. |
| 59 03 22 |
THORNTON STACEY |
32 |
STUMPF AVE |
Draft
|
Fuel Gas |
|
36.00 |
Payment Due |
Run gas line too gas heater installed by other air test |
| 40 17 06 |
THOMASTON RE HOLDINGS LLC |
92 |
MAIN ST |
25-101CA
|
COC |
11/13/2025 |
|
Approved |
In the prep room, install new lighting, relocate power for an oven, install power for a grease trap. |
| 40 17 06 |
THOMASTON RE HOLDINGS LLC |
92 |
MAIN ST |
25-100CA
|
COC |
11/13/2025 |
|
Approved |
Install (1)-3 Bay Sink with grease interceptor and (2) hand sink |
| 40 17 06 |
THOMASTON RE HOLDINGS LLC |
92 |
MAIN ST |
25-99CA
|
COC |
11/13/2025 |
|
Approved |
Prep room. instal new impact doors, wall covering, ceiling tiles, relocate combi oven, install lighting, install 3-bay sink, install grease trap for sink |
| 37 02 23 |
MAGNUSON RICHARD A & MARIA |
25 |
LYNNRICH DR |
25-98CA
|
COC |
11/13/2025 |
|
Approved |
Service upgrade from 100 to 200 amps. wiring for installation of new outdoor ductless system. |
| 37 02 23 |
MAGNUSON RICHARD A & MARIA |
25 |
LYNNRICH DR |
25-97CA
|
COC |
11/13/2025 |
|
Approved |
Install 2 new RunTru mini splits. One 9k btu head unit into the upstairs right bedroom, 12k Btu head unit into the main bedroom lined up with the hallway. Lineset, electrical and drainage to be run through the attic to the side of the house for one main line going down the side of the house.
RunTru Multi Zone 19 SEER Ductless 2-Port Condenser, 18,000 BTU Heat Pump
RunTru Multi Zone 19 SEER Ductless Wall Hung Unit, 9,000 BTU
RunTru Multi Zone 19 SEER Ductless Wall Hung Unit, 12,000 BTU |
| 37 02 23 |
MAGNUSON RICHARD A & MARIA |
25 |
LYNNRICH DR |
25-96CA
|
COC |
11/13/2025 |
|
Approved |
Wiring for installation of outdoor ductless heat pump |
| 72 01 01 |
SUMMIT CORP OF AMERICA |
1430 |
WATERBURY RD |
Draft
|
Fuel Gas |
|
219.00 |
New |
3" Black steel gas line aprox 200' across factory |
| 10 04 04 |
SAMELA NICHOLAS L & PAMELA J |
244 |
SMITH RD |
25-95CA
|
COC |
11/12/2025 |
|
Approved |
Roof replacement |
| 71 01 06A |
TEELAN JOHN |
1402 |
WATERBURY RD |
25-8G
|
Fuel Gas |
11/13/2025 |
46.00 |
Approved |
Install 1-120 gallon leased LP tank and 5' of 1/2" coated copper gas line to OEM stub out. |
| 15 04 05 |
GARRETSON WILLIAM R & ELAINE C LIVING TR |
450 |
MICHELLE LN NORTH |
Draft
|
Building |
|
358.00 |
New |
Re Roof, remove old, tape seams, ice/water 6 ft etc. |
| 19 02 04 |
APRIL ADAM S & DEBORAH A |
388 |
VALLEY VIEW RD NORTH |
Draft
|
Building |
|
478.00 |
New |
This project involves a complete roof replacement on a single-family residential property. The scope of work includes removal and disposal of existing laminated slate-look composition shingles and installation of new 30-year laminated architectural shingles. Work covers the replacement of 31.09 roofing squares, drip edge, underlayment, starter course, hip/ridge caps, ice & water barrier, and modified bitumen joint taping (4” seam). Additional work includes replacement of flashing at pipe jacks, chimney flashing, and addressing steep roof sections (7/12 to 9/12 slope). The roof area totals approximately 3,109 sq. ft., with a perimeter length of 476.48 ft and ridge length of 116.93 ft. All materials and installation comply with current Connecticut Building Code standards. No structural changes will be made. Project value is $36,188.57, performed under Flash Roofing LLC’s supervision and in accordance with applicable safety and workmanship regulations. |
| 54 01 04 |
THOMA EILEEN |
85 |
PLEASANT VIEW RD |
Draft
|
Mechanical |
|
154.00 |
New |
Installation of an oil Purepro boiler M#AOT-3-075E |
| 21 02 02 |
JAMIESON ELIZABETH LIVING TRUST |
496 |
WALNUT HILL RD |
Draft
|
Fuel Gas |
|
48.00 |
New |
Set single 120g propane tank next to the chimney on the driveway. Run 5/8" coated copper piping from tank location, into the basement, through ash catch and into the fireplace for future gas insert. |
| 28 01 06 |
SYNOTT JOSEPH H EST |
413 |
HICKORY HILL RD |
Draft
|
Electrical |
|
36.00 |
New |
Original electric service was torn from siding of home. House is currently without power. Description of work to be performed is repairing the original siding where possible and placing a meter mounting plate from Azek PVC. New meter box with 2" PVC pipe to PVC weatherhead, which will be connected by licensed electrician. Service wire from weatherhead will be 4/0 ALU service cables down to the meter. Original SEU cable from meter to main breaker will be utilized until a later date, at which time it will also be brought into the home with PVC piping and new cable. |
| 21 01 04 |
OBRIEN MARK A & CAROL A |
619 |
WALNUT HILL RD |
25-94CA
|
COC |
11/10/2025 |
|
Approved |
RE-ROOF, TEAR OFF OF EXISTING ASPHALT SHINGLES AND INSTALL OF NEW ASPHALT ARCHITECTURAL SHINGLES WHILE COMPLYING WITH ALL NECESSARY CODES (ICE AND WATER, SEAM TAPE, ETC.) |
| 31 05 19 |
GENEST PAUL M JR & TAMMY A |
22 |
WOODRUFF AVE |
25-6G
|
Fuel Gas |
11/12/2025 |
48.00 |
Approved |
Running new natural gas piping from the existing gas piping in the home into the ash catch and up to the fireplace for a future fireplace insert. |
| 27 01 21 |
KING TYLER JAMES & KAY |
297 |
VALLEY VIEW RD NORTH |
25-151B
|
Building |
11/12/2025 |
202.00 |
Approved |
Tear off shingles down to the decking, inspect decking make sure it’s a solid nailable surface, add 6 feet of ice and water shield from the eaves up and around valleys. Add 4 inch seam tape for all seams of the decking, add
Synthetic felt for the remaining decking visible, add starter course shingles E+R. Add drip edge and rake edge, add OC duration onto black shingles, add ridge caps.
|
|